Skip to content
Riverstone Concrete logo

Riverstone Concrete · Gold Coast

House Slabs — Gold Coast

The slab is the foundation everything else sits on. We pour house slabs and extension slabs across the Gold Coast, working from your plans and coordinating with your builder or certifier where needed.

House slab preparation with formwork and reinforcement

Applications

House slabs are poured to engineered plans for new builds, with reinforcement and preparation exactly as specified. Slabs for extensions and additions are tied into the existing structure as the plans require.

Complete slab packages are also available for granny flats and secondary dwellings on residential blocks.

Options and finishes

Slab type, thickness and reinforcement come from your engineer's design rather than a one-size approach. Site preparation — excavation, levelling, compaction and termite treatment coordination — can be included in the scope.

Plumbing rough-in, electrical conduits and setdowns are planned with your builder before the pour so nothing is missed on the day.

What affects your quote

Every site is different, so we don't quote from a price list. These are the things Tony looks at during the site assessment before your written quote is prepared.

  • Engineered plans and soil reports specific to your block
  • Site access for excavation, trucks and pumps
  • Cut and fill requirements on sloping blocks
  • Timing with your builder's schedule and other trades

Related projects

  • Formwork, membrane and reinforcement mesh before a concrete pour

    Slab preparation and reinforcement

    Formwork, membrane and steel reinforcement mesh in place ahead of the concrete pour. This photograph shows the preparation stage.

View all projects

From enquiry to handover

  1. Tell us about your project

    Call Tony or send the enquiry form with what you need and your suburb.

  2. Arrange a site assessment

    Tony visits to measure up and talk through finishes and options.

  3. Review your written quote

    You receive a clear written quote to consider — no obligation.

  4. Construction and handover

    The same crew prepares, pours and finishes, then walks the job through with you.

House Slabs FAQs

Do you work from engineered plans?

Yes. House slabs are poured to the engineer's design for your block. Send the plans with your enquiry or bring them to the site assessment.

Can you handle site preparation?

Excavation, levelling and compaction can be included in the scope. What's needed depends on your block and is itemised in the written quote.

How do you coordinate with my builder?

We work to your builder's schedule and confirm plumbing, conduits and setdowns before the pour so nothing is missed.

Do you pour slabs on sloping blocks?

Yes, though sloping sites usually need cut and fill or additional preparation. The site assessment establishes what's involved.

Discuss your house slabs project

Tell Tony about your property and what you have in mind.

Get a Free Quote
Call Tony Free Quote